AW Electrics are an Official Trusted Partner of Octopus Energy. Switch to Octopus Energy and you'll get £50 credit once your switch is complete. Existing customer? Find out how you can benefit too. T&Cs apply (only one switching offer per household).
Solar panels are rapidly becoming a standard feature of new build homes across the UK. With regulatory changes on the horizon and energy performance expectations rising, developers and self-builders can no longer treat solar as an optional upgrade.
From October 2026, proposed legislation could make solar photovoltaic systems mandatory on new homes.
For property developers, architects, and individuals planning their own build, integrating solar panels at the design stage is not just compliant — it is the most cost-effective and future-proof approach.
AW Electrics works alongside developers and self-build clients to design and install solar systems at the appropriate stage of construction, ensuring efficiency, compliance, and long-term performance.
A Private Member’s Bill currently progressing through the House of Commons proposes requiring all new homes built from 1 October 2026 to have solar photovoltaic generation installed. The Bill would require the Secretary of State to make regulations mandating solar PV on new homes and set minimum compliance standards.
The proposal states that solar PV systems should generally cover an area equivalent to at least 40% of the new home’s ground floor area. This reflects options outlined in the 2023 Future Homes and Buildings Standards consultation.
Full details of the Bill can be found via Parliament here: Solar PV on New Homes Bill
Further background on the policy context is available from the House of Commons Library: Future Homes and Buildings Standards Briefing
While the legislation is progressing through Parliament, the direction of travel is clear. Solar integration is becoming the norm for new housing developments across the UK.
The cheapest and most efficient time to install solar panels is during the construction of a property. Retrofitting solar after completion is always more complex and more expensive.
By incorporating solar at the design stage, developers can:
Planning early allows the solar system to become part of the building fabric rather than an add-on.
AW Electrics works directly with developers, architects and project managers to advise on layout, panel positioning, inverter sizing and grid connection requirements before the build reaches first fix stage.

For individuals building their own home, 2026 represents an opportunity rather than a burden. Designing a home with integrated solar from day one allows complete control over energy performance.
Self-builders can plan:
Early planning avoids awkward retrofits and ensures that solar technology complements the overall aesthetic and technical design of the home.
The proposed requirement that solar PV should cover an area equivalent to 40% of the home’s ground floor area is significant. For many properties, this will require careful roof space allocation and system design.
A home with a 100m² ground floor footprint could require approximately 40m² of panel coverage. Depending on panel size and efficiency, this may mean installing 15 to 20 panels or more.
Roof layout, shading analysis, chimney placement and dormer positioning all influence how effectively this requirement can be met. This is why early consultation is essential.
AW Electrics can assess architectural drawings and provide solar feasibility input before final planning submissions.
Battery storage is not yet mandatory under the proposed legislation, but planning for it during the build stage is highly advisable.
Installing batteries later can require additional wiring, wall modifications and reconfiguration of electrical systems. When planned early, battery storage can be seamlessly integrated into utility rooms, garages or plant spaces.
Benefits of early battery planning include:
As energy pricing structures evolve, battery storage will likely become a standard expectation for high-performance new homes.
New homes are increasingly marketed on energy performance and sustainability credentials.
Buyers are now actively looking for:
Developments that integrate solar professionally at build stage gain a competitive advantage.
Solar panels reduce operational costs from day one, improving the attractiveness of new homes to cost-conscious buyers.
For developers, this strengthens marketing positioning and long-term asset value.
As regulation evolves, compliance will be critical. Solar installations on new builds must meet electrical safety standards, grid connection requirements and manufacturer specifications.
Working with experienced installers ensures:
AW Electrics provides compliant solar installations designed specifically for new build environments, working alongside site managers and contractors to deliver smooth integration at the correct construction phase.
Building with solar is not just future-proof — it is financially efficient.
A Bill currently progressing through Parliament proposes requiring solar photovoltaic systems on new homes from 1 October 2026, with minimum standards including coverage equivalent to 40% of ground floor area.
While legislation is still progressing, forward-thinking developers are already integrating solar into new build designs to prepare for regulatory change.
Yes. Solar systems can be designed to suit detached homes, semi-detached properties, apartment blocks and larger housing developments.
Battery storage is not currently mandatory but planning space and wiring during construction is highly recommended for future flexibility.
Yes. Installing solar panels during the build stage is significantly more cost-effective than retrofitting after completion.

If you are a property developer, architect, or planning your own self-build home, now is the time to incorporate solar into your design.
AW Electrics provides expert advice at the design stage, detailed system planning, and professional installation at the appropriate phase of construction.
We work alongside your build team to ensure seamless integration, regulatory compliance and long-term performance.
Contact AW Electrics today to discuss your new build solar requirements and ensure your project is ready for 2026 and beyond.
| M | T | W | T | F | S | S |
|---|---|---|---|---|---|---|
| 1 | ||||||
| 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 9 | 10 | 11 | 12 | 13 | 14 | 15 |
| 16 | 17 | 18 | 19 | 20 | 21 | 22 |
| 23 | 24 | 25 | 26 | 27 | 28 | 29 |
| 30 | ||||||